Dénia.com
Search

Opinion Pepa Font (GDCU): «A step forward»

29 July 2016 - 23: 55

That's the attitude you should take a team of government, to step forward, look to the future, leaving behind failed actions, which over time is proving that proved futile.

Again rises from the ashes the old aspiration of the Second Health Center Miguel Hernández, an issue that starts in March 2007, and has date, already have cost all dianenses near 7 million euros, moment. I say so far because there was still buy a small wedge of land on the site famous. Land that has cost us EUR 289.000,00 and 283,60 measures a whopping m2. Altogether a 5.000 m2 in lands that do not yet have the promised infrastructure and for which charters purchased.

Pepa Font - Spokesperson GDCU

But the truth is that from the beginning, everything has been done in a disastrous way, being in the end the pagans of so much clumsiness, the residents of Dénia. When the purchase was approved, it was already announced that it could not be carried out in the way that it was being carried out, and finally the courts confirmed this. A few months after the plenary approval, the 1st assignment of the land to the Generalitat Valenciana was proposed so that the procedures for such a long-awaited installation could begin. Despite notices from Marina Salud that the land should border Miguel Hernández Avd., the only ones that did not do so were ceded. And to make matters worse, in the only municipal plot of land that covered the aforementioned Avd, in 2015 the Party builds a Children's Park with deficiencies that had to be corrected six months later, and that at this time, and thanks to its non-existent shaded area, is practically useless.

Now you want to correct the error and give 2007 land bordering Miguel Hernández, to promote the construction of the second health center. But ladies and gentlemen, we are in 2016 and the situation has changed radically, though certainly continue to require a health center in the north of Denia. Since the journey of this project started, there are several circumstances that have radically changed the health situation in our city. The disappearance of the Old Outpatient caused Marina Health, with the support of the Generalitat Valencia, transformed the former Hospital of La Pedrera Health Center and specialties. The expansion of facilities Pedrera not know anything.

But the most striking theme is that in the Five-Year Investment Plan Marina Salud 2014-2019 not have plans to build a new health center, or Dénia and Pedreguer, two of the planned investments in the concession .

So what sense does it make that in 2016 we are debating, buying land and ceding it if we know that it will not be carried out? Let's give a real purpose to a "municipal" plot, let's not forget it. That's why since Gent of Dénia – Center Unificat we propose that it be used according to the needs of our city.

In the explanatory meetings on the drafting of the future General Plan indicated that the quarry of Castell would become a large parking lot, so that facilities such as Planning and Youth is desperecerían of current location and the Reading Agency Baix La Mar and other activities Llunàtics and Dinamics taking place right now.

If that's really the foresight of the government team of the PSPV and Compromis, with the support of CET (Podemos), from these lines we propose the following action in the field of Miguel Hernández.

In a first 2500 m2 sector without access Avenue:

1.- Social housing construction is projected, due to the large number of needy families and owed to solve their housing problems. Few actions have been taken since a year ago, we adopted antidesahucios measures, and the Joint Committee for Social Housing will be promoted. Nor it has called the Covenant or the Joint Committee. This would be a real and powerful measure that would solve a latent lack in our city.

2.- Allocate the entire ground floor of the building to install the Department of Planning and Environment, equipping it with modern facilities commensurate with the needs of two very important for the daily life of dianenses, especially the Department of Environment departments.

In the second sector also 2.500 m2, with access from Avenue:

1.- the construction of new facilities is drafted to accommodate the needs of Llunàtics and Dinamics and facilities of the Department of Youth. This project could include installing a small room-auditorium with reduced capacity (no more than 400 people), several exhibition halls and the Reading Agency Baix La Mar.

2.- A diaphanous installation was designed as a multipurpose room, which would accommodate all those activities that often for lack of space on the public road or weather inclemencies can not be done outdoors. This room could be used for fairs, meetings, etc ...

Surely this proposal will in the drawer of oblivion, but we must stop looking to the past and be realistic, noting what the current needs of the city and allow ourselves to make toast to the sun, giving five minutes of glory, but contribute little to dianenses.

Pepa Font Reus
Gent spokesman Denia-Center Unificat

Leave a comment

    37.861
    4.463
    12.913
    2.710