The endorsement of the Dénia Socialists for the 26M: the biggest change in Dénia in recent years
Share
384
Comment it
0
May 22 from 2019 - 00: 45
Celia Marín
New squares, improved spaces, areas recovered for people... The socialists of Dénia, led by Vicent Grimalt, arrive at the meeting on May 26 with the biggest change that Dénia has experienced in recent years behind them.
Four years in which they have had time to act in the city center, but also in Les Rotes, Les Marines and Montgó, carrying out interventions of greater or lesser magnitude that have achieved the same goal: improving the quality of the residents of all those areas.
The passage of the socialists through Dénia, neighborhood by neighborhood
CENTER OF DÉNIA
New elevator in the Toy Museum.
Swing adapted for people with functional diversity in the park of La Vía street.
New roundabout in Joan Fuster and opening of Pintor Llorens street for pedestrians. Two lanes in each direction on the avda.
Remodeling of platforms and rehabilitation Train station -TRAM.
New perimeter fence for the train station.
New pergola and slide in the playground of the Health Center.
Redevelopment and waterproofing of Seamen's Group seats to solve moisture problems.
New LED lighting in the Paseo del Saladar.
Planting bushes and trees in the Paseo del Saladar.
Opening by agreement with the owner of the free parking next to the health center.
Improvement of the floor of the children's playground of the Group of Mariners (also painting and replacement of bins).
Adaptation with gravel parking next to the playground of the Group of Mariners.
Assignment of the old building of La Faroleta located in the Group of Mariners by Ports to rehabilitate the building and fill it with content.
Relocation of the tourist office in its old place and savings of 50.000 euros in rentals.
Extension of sidewalk, placement of trees and banks in the Oculist Buigues square. Removal of a prefabricated house in front of the tourist office.
New storm drains on Av. Marquesat with Pintor Llorens street.
Expansion of chamfer and recess for pedestrians in Elx street with Carlos Senti street.
Improvement of the planters of La Via street.
Covering of tree pits in La Via street and repair of potholes in the paving.
JAUME I-SALADAR AREA
Renovation of the artificial grass of the Rodat football field
Redevelopment of the Square Archduke Carlos to become a large square with green areas
Asphalting of streets: Sagunto, Avenida de Alicante, Barbacana, Germans Gavilà Ferrer, Archduke Carlos square, Avda del Montgó, Jaume I square, parking of the House of Culture, Torrecremada road, Paseo del Saladar, Calle Sertorio, Lepanto and Pedreguer ...
Renovation of sidewalks in Calle Quevedo, Calle Sagunto and Avenida de Alicante
Improvement of the lighting of the Children's Park of Avda de Alicante
Placement of mirrors at the intersections of the Avenida de Alicante to improve road safety
Placement of banks and bins in the Avda de Alicante
Placement of banks in Patricio Ferrándiz between Sagunto Street and Archduke Carlos Square
Painting and signage of all parking spaces for people with functional diversity
Change of windows of the Cervantes school and security railing at the entrance of the school.
Covering of the alcorques of the Avda. De Alicante
Improvement of pedestrian itinerary that goes to La Pedrera: improvement and continuity of the sidewalks, new banks ...
New swings for people with functional diversity in Jaume I square
New headquarters of the old SERVEF, now on the Avenida Joan Chabàs, named LABORA.
New LED lighting on the Paseo del Saladar, and on Avenida Joan Fuster
Streetlamps with illumination on the sidewalk on the stretch of Avenida Joan Fuster between Avda. Joan Chabàs and Diana street.
Planting trees and shrubs on the Paseo del Saladar
New provisional rotary at the end of the ave. Joan Chabàs (waiting for the definitive one financed by the Generalitat Valenciana) in the link with Joan Fuster
Improvements in the sports pavilion of Joan Fuster: photothermal installation and propane in the pavilion,
Expansion of the sidewalk at Joan Fuster next to the basketball pavilion
Placement of 2 banks at the entrance of Vessanes school
Construction of roundabout at the confluence between Joan Fuster and Diana Street
Renewal of the pluvial of the Joan Fuster Avenue to increase the drainage capacity of the avenue
Assignment of parking lot in Avda. del Montgó
More bike parks adapted to the regulations
Bell Dénia without cacas.
Improved energy efficiency: LED lighting on the Paseo del Saladar
Improvement in the lighting of Joan Fuster, with the placement of light on the sidewalks between Turia Street and Diana Street
New headquarters of the University of Alicante in Dénia (in the premises that it shares with the official language school)
Improvement of the chamfer between the street Mestre Serrano and Pedreguer, eliminating a concrete obstacle in the corner of the old "Cosetes" and remaking the sidewalk.
BAIX LA MAR
Reconstruction of imperial staircase and esplanade of the Palau del Gobernador of the Castell de Dénia.
Obtaining subsidy to rehabilitate the Verger Alt in the Castell de Dénia.
Works to improve safety in the multipurpose room of Llunàtics.
Improvements in the facilities of Llunàtics: reform of the upper bathrooms of the building, change of pavement of the 6 and 11 classrooms, reform and refurbishment of the Jove Consultation, painting of the building ...
Improvements in Youth: youth dissabtes, more courses, urbajove, Halloween... opening of the youth art room and renovation of the room.
Placement of more banks and replacement of trees in Avda. Dels Furs.
Pedestrian access next to the parking enabled during the summers, in C / Ausiàs March, to access the urban area from the Marines.
Asphalted port facade and Pont Street.
New LED lighting on the port facade.
New pedestrian crossing signs with light to improve safety.
Sidewalks on the seafront (new 4).
More parking facilities.
Improvement of lighting in a section of Ronda les Muralles, next to Pont Street.
Arrangement of the sidewalk of Ronda Walls between Pont Street and Senieta Street.
Reordering and new image of the terraces of the maritime facade.
Repair scuppers in Plaza de la Creu.
Imminent installation biosaludable park in Av. Miguel Hernández.
LES ROQUES
Redevelopment C / Sant Francesc
Children's Park on Avda. Miguel Hernández (fencing and completion of works)
LED lighting on the streets of Miraflor, Atzuvia, LLavador, Sant Andreu, Sant Roc, Xàbia and Plaza Maria Morand. Also Sant Francesc
Renovation of sidewalks: Construction of pending sections on Miraflor, Xàtiva, Llavador and Mira-Rosa streets; arrangement of sidewalks in the neighborhood of les Roques: Sant Vicent de la Roqueta ...
Asphalting of streets: L'Atzuvia, Miraflor and Sant Francesc
Rainwater renewal in the San Andrés group to prevent flooding in the area and connection to the sewage system of Miguel Hernández
Assignment of land for the construction of the second health center. Completion of bureaucratic procedures and purchase of land.
New bike parks and removal of those who did not comply with the regulations
Rebates in pedestrian crossings of Benicadim Street
Creation of the residential area for exclusive parking for residents with cards
Opening of the PROP office and new citizen attention offices in the city of Dénia
Improving accessibility and signage in the castle
PORT
Rehabilitation of the Lonja for sea museum and tourist info office.
New pedestrian promenade between the Moll del Martell and the Plaza de Bous a la Mar.
Redevelopment Sandunga Street and Plaza Sant Josep.
Redevelopment of Fontanella Street and Fontanella Square.
New bicycle parking.
Asphalting of a stretch of Calderón street (between Jorge Juan square and Joguet museum) and the port facade from Benidorm square to the roundabout of the Oculist Buigues square, C / Pont.
Repair of the low wall on the beach walk of Cagarritar.
Improvement of lighting in pedestrian crossings with the placement of auxiliary spotlights in the streetlights of the Cervantes esplanade.
Purchase of the former site of the ambulatory for citizenship.
Removal of the perimeter fence and temporary conditioning, benches and bins.
Reordering and new image of the terraces of the seafront.
New lighting columns on the harbor promenade of Moll del Martell - Lonja.
Repair and improvement of scuppers in Plaça de la Creu.
Improvement of the Marqués de Campo sidewalk, to avoid falls when it rains and leveled the cobblestones.
Safety railing at the exit of the conservatory, in Temple Sant Telm street.
Lowering of sidewalks for accessibility in the Cervantes esplanade, at the height of the L'Ànfora restaurant and crossing the road to the seafront.
Demolition of the chiringuito of the Cervantes esplanade to extend the walk.
New LED lighting in Sandunga and Fontanella streets
LES ROTES
Bus timetable extension in summer.
Asphalting of streets: Section of C / Milky Way, Camí de Badia, C / Io, C / Jupiter, parking next to the Camí de la Raconà, section road from Dénia to Javea between the yacht club and the roundabout of the hotel Port Dénia, stretch road from Dénia to Jávea at the height of the Los Molinos urbanization, stretch C / Aquari.
Parking and dissuasion in summer next to the Les Rotes hotel, horizontal and vertical signage at the intersection next to said hotel.
Repair of subsidence in the pavement of the Marineta promenade at the height of the Marge Roig to avoid puddles when it rains.
Replacement of cast iron benches on the Rotes-Marge Roig promenade.
Placement of poles and ropes in cliff areas of Paseo de les Rotes.
Repair and construction of a protective wall next to the Cemetery of the English.
Construction of two wooden stairs and ramps to access Marineta beach in Marge Roig.
DNA festival in the Marineta Cassiana.
New bicycle for the Biosaludable park of Marineta Cassiana.
Sidewalks in the Marineta, at the height of the ramp that gives access to the Marge Roig.
New adapted bathroom installation, with chairs, railing and shade in the water, financed by the Valencian Tourism Agency. New changers also on this beach.
Partial improvement of lighting on Casiopea street.
Sidewalks for passers-by on the road of Las Rotas in front of the yacht club.
Sidewalk recess at the bus stop at Calist Street. And conditioning of the street that goes down to the Marge Roig.
New recesses for pedestrians at the junction of Les Rotes road at the height of C / Perseu and Camí la Raconà.
New sidewalk on Aldebarán street (250m).
New bus shelter in front of Hotel Port Dénia.
Improvements to the path that goes to the Tallà cave and new signage.
Bird and cetacean sighting spot at the end of the Las Rotas road, with benches, pergola, bins and information panels.
Improvement of road signs, horizontal, vertical, placement of poles and ropes at the end of the Rotas road to improve the safety of pedestrians and restrict parking in the area.
Repair of a section of walk of Las Rotas, between Mena and Punta Negra, next to a ravine (stairs and ramps of the new ravine).
Authorization has been obtained to put back ramp (wood) to access the sea in Punta Negra beach.
More parking and signage of all functional diversity places.
LES MARINES
Asphalting of streets: Llanxa, Veler, Palabot, Rap, section Assagador de la Marjal, Xalana, Canoa, Melva, section in Partida L'Estanyó Nord B, section in Palmars Nord C, Verderol, Balandre, Camí de Gandia.
Cover of the Regacho de las Marinas. Phase I.
Finish a stretch of sidewalk Canoa street.
Repair pipes in Les Bassetes park, to avoid odors, and control box in the Bassetes regatxo.
Parking in several streets (Bassetes park, sports center ...).
New changing rooms on the beaches by the Valencian Tourism Agency on Raset beach.
New aquatic playground in the Raset.
New green area in front of Las Marinas gas station.
New LED lighting in the streets: Assagador de la Marjal, Llanxa, Melva, Camí del Regatxo.
Park Workout and calisthenics in the sports center.
Improve energy efficiency of the sports hall, change of windows, solar panels and renovation of the pavilion showers.
More lifeguards on the beaches and extension of first aid service to Easter and until the October bridge.
Plantation of new trees after the removal of palm trees by picudo and placement of picnic benches and new bins in the Bassetes park.
New information panels in green areas.
Environmental information point in the Les Bassetes park during the summer.
Tender for the renovation of the athletics track of the sports center.
BOVETES
Asphalting of streets: Bequeruda, Cigonya, Coral Sea, Camí Vell from Gandia to Dénia, Llac Maracaibo. In Montepego: Calle Golondrinas, C / Águilas.
More lifeguards and extension of the surveillance service.
Completion of the Marines-Deveses sewer collector.
New water station for footbaths in the Molins area.
Repair and expansion of the number of footbaths in the Deveses and Molins area.
Repair of the mouth of the Girona river by the Hydrographic conference, with the construction of breakwater margins next to the houses to prevent floods.
Improvement of the information panels of beach services.
Installation of guardrails in street Golondrinas de Monte Pego.
New signage for green areas and recommended bike itinerary between them.
Reinforcement of the staff of the Local Police in summer with 12 agents and start-up of the DÉNIA CARES program, for tourists and residents.
Improvement of the crossing of Las Marinas between km 3 and 5 (lanes for bicycles and pedestrians, delimitation of passage of vehicles, new stretches of sidewalk, new intercity bus stops with marquees, asphalting and horizontal and vertical signage)
Approval of the project to regenerate the beach of Les Deveses with the construction of 2 new breakwaters and the extension of another one; and the contribution of sand.
Arrangement of a section of collector on Txad street and Riu Gorgos street (commissioning of these sewer sections)
MONTGÓ
Improvements in the building of the residence of Elderly of Sta Lucia.
Asphalting of streets: section of the Camí de Sant Joan, C / Venus, C / Calist, C / Violeta, C / de la Rosa, C / Nard, C / Atamant, C / Eros, C / Apol • lo, C / Teseu , C / Pera, section of Camí de la Galera, C / Llentiscle, C / Miranda, section C / Aquari, section Camí Merle, section C / Ginjoler, C / Lliri. - Extension of a section of the Camí Alta from Dénia to Xàbia, near Ogisaka Garden.
Improvement of the lighting of the Aquari Street park and installation of a playground.
Placement of more game tracks for the skate park, which were located in Llunàtics.
Placing information panels in the green areas.
Creation of pedestrian itinerary in C / Teseu and rearrangement of traffic.
Conditioning of the route for pedestrians at the Carmelitas school and installation of a safety railing.
Signage and bollards in the street Mayor de la Pedrera to avoid traffic jams by badly parked vehicles.
Implementation of public transport in the Montgó during the summer.
Placement of guardrails on Algol street, on a road with two levels of height
Improvements in hydrants, masonry walls, landscaping and non-existent perimeter wall (in the part that overlooks Joan Fuster) in the first phase of Bosc De Diana.
Improvement in the signage of the crossing of the Residence of Santa Lucia (signs, give way, painting roads, milestones ...) and in Galeretes
Improvement of the signage of the routes and access to the Montgó Natural Park.
Improvements in the Bosc de Diana: delimitation of roads, planting trees, new sliding doors, hydrants ...
Decommissioning ecoparc zone in the green zone of Al-khalif by judgment of a court. In its place tree planting and environmental restoration.
Creation of itinerary on foot from Avda. Del Montgó to La Pedrera, reconstructing stretches of sidewalk and placing new banks.
Opening to road traffic of the Joan Fuster road next to the Chabàs institute. Removal of architectural barrier, redistribution of the circulation senses and placement of bicycle and motorcycle parking.
Adaptation of the Barranco de la Cova de l'Aigua to improve the drainage capacity of the ravine in urban areas.
Montgó scientific station: banks, litter bins, rehabilitation of the house of Yrida ...